40KW 3 PHASE 400V 63AMP
- Consumption and installation of a floor socket are included in the electricity order. Power outlets will be routed to the same point and will be placed in the back room or the innermost corner of the stand.
- When installing your own equipment, the exhibitor is responsible for ensuring CE approval and that installation is carried out by a certified Norwegian installer.
- If you want the power supply delivered to a specific point on the stand, an additional socket (item no. 4203) must be ordered, and a layout sketch must be sent to us. You can find the drawing template under the "Document Archive"